摘要
针对高校建筑工程工程量清单及招标控制价的合理编制,从招标阶段设计文件质量,工程量计算的精准度,项目特征描述的清晰度、完整度、准确度,各项费用的规范计取及最终的复核工作等实施细节入手,提出相应的完善和保证措施。
To reasonably compile the bill of quantities and the tender control price,this paper put forwardeffective measures to guarantee the quality of bidding documents designed at the bidding stage,the precisecalculation of quantities,the clear and complete description of project characteristics with accuracy,thestandardized calculation of expenses, and the eventual review work as well.
作者
施晴
SHI Qing(Jiangsu College of Engineering and Technology,Nantong 226007,China)
出处
《江苏工程职业技术学院学报》
2018年第4期67-70,共4页
Journal of Jiangsu College of Engineering and Technology
关键词
工程量清单
招标控制价
国有资金投资建设项目
工程量计算
项目特征
bill of quantities
tender control price
construction projects with state-owned funds
calculation of quantities
project characteristics