结合上海某建筑工程,对地下室土方开挖施工过程中出现的基坑变形问题进行分析;采用跳仓法对其第三层土方进行开挖施工,给出了跳仓法施工仓的划分方案、跳仓法施工工艺及施工要点等。实践证明,实施跳仓法以"缝"代"带",可有效控制基坑围护变形,缩短工期,确保施工质量,具有较好的经济效益和社会效益。
In terms of a construction project in Shanghai,this paper analyzes the deformation of foundation pit in the process of underground earthwork excavation.The third layer of earthwork is excavated by jump warehouse method,and the classification,construction technology and key points of this method are elaborated on.The practice has proved that the practice of “seam” replacing “belt” can effectively control the deformation of foundation pit enclosure,shorten the construction period,and ensure the construction quality,and this method achieves good economic and social benefits.
作者
黄金星
王守鹏
施浩席
倪俊峰
赵晓雷
HUANG Jin-xing;WANG Shou-peng;SHI Hao-xi;NI Jun-feng;ZHAO Xiao-lei(Shanghai Engineering Department,Jiangsu Nantong Second Construction Group Co.,LTD.,Qidong 226200,China)
出处
《南通职业大学学报》
2018年第4期97-100,共4页
Journal of Nantong Vocational University
关键词
深基坑
围护结构
跳仓法
变形控制
deep foundation pit
enclosure structure
jump warehouse method
deformation control