摘要 现浇箱梁支架施工具有施工工艺复杂、流程繁琐等特点,因此在具体施工过程中应该合理组织施工、控制工程质量。以某高架桥(K43+966. 63~K45+720)右幅第一联为工程实例,对桥梁的现浇箱梁支架施工方案与施工工艺进行设计和探讨,对于现浇箱梁支架设计和施工具有较好的指导作用。 The construction of cast-in-situ box beam support is with features of complex construction technology,cumbersome procedure and so on. Therefore,the construction should be organized reasonably during the specific construction procedure to control the engineering quality. Taking the first section of the right side of an overhead viaduct( K43 + 966. 63 ~ K45 + 720) as the engineering project,the design and discussion on the construction scheme and construction technology of cast-in-situ box beam support of bridge are made,which has better guidance effect for the design and construction of cast-in-situ box beam support.
作者 王小靖 WANG Xiao-jing(Yangquan Road Management Office,Yangquan 045000,China)
出处 《北方交通》 2019年第1期45-48,共4页 Northern Communications
关键词 桥梁工程 现浇箱梁支架 施工工艺 Bridge engineering Cast-in-situ box beam support Construction technology
  • 相关文献

参考文献3

二级参考文献4

共引文献15

同被引文献19

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部