期刊文献+

长大高速公路隧道地质超前预报现场应用 被引量:2

Site Application of Geological Advanced Prediction of Tunnel for Changda Expressway
下载PDF
导出
摘要 隧道施工风险性较高,隧道超前地质预报是隧道施工过程中必须开展的一项工作,可有效探测掌子面前方的不良地质,根据探测结果提前预警,避免地质灾害的发生。以江西某公路隧道为研究对象,通过地质雷达和TSP203两种方法开展隧道超前地质预报工作,与现场开挖对比分析,地质雷达和TSP203可有效识别掌子面前方的不良地质,具有较高的准确性,为隧道施工提供指导。 The tunnel construction risk is higher. The geological advanced prediction of tunnel is a piece of work that must be performed during the period of tunnel construction,which can effectively detect the unfavorable geology in front of the tunnel face. Warn in advance can be provided according to the detection result to avoid the occurrence of geological disaster. Taking a highway tunnel in Jiangxi as the research object,the geological advanced prediction work for the tunnel is performed by two kinds of methods like geological radar and TSP203.The contrastive analysis of site excavation is made. The geological radar and TSP203 can effectively identify the unfavorable geology in front of the tunnel face,with higher correctness,which can provide guidance for the tunnel construction.
作者 周浩宇 陆超 杨永平 ZHOU Hao-yu;LU Chao;YANG Yong-ping(Jiangxi Traffic Consulting Co.,Ltd.,Nanchang 330008,China;Zhonglian Construction Group Co.,Ltd.,Nanchang 330038,China)
出处 《北方交通》 2019年第1期81-83,共3页 Northern Communications
关键词 隧道施工 超前预报 TSP 地质雷达 Tunnel construction Advanced prediction TSP Geological radar
  • 相关文献

参考文献4

二级参考文献23

共引文献408

同被引文献16

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部