期刊文献+

基于模糊综合评价法的养老PPP项目绩效评价研究 被引量:2

Research on Performance Evaluation of Pension PPP Project Based on Fuzzy Comprehensive Evaluation Method
下载PDF
导出
摘要 根据PPP绩效评价方面的研究成果,结合养老项目的特点,从项目环境、项目自身特点、项目参与者、项目阶段、项目社会影响力5个方面,建立了养老PPP项目绩效评价指标体系.在此基础上,以"枫叶正红"养老院项目为研究对象,采用模糊综合评价法对其进行绩效评价.结果表明,项目自身特点与项目参与者是影响项目绩效最主要的因素.研究结果有利于科学评价养老PPP项目的绩效,促进养老产业的进一步发展. According to the research results of PPP performance evaluation,combined with the characteristics of the pension project,from the five aspects of project environment,project characteristics,project participants,project stage,project social influence,etc.,the performance evaluation index system of pension PPP project was established.On this basis,the“Maple Leaf Zhenghong”nursing home project was taken as the research object,and the fuzzy comprehensive evaluation method was used to evaluate its performance.The results show that the project's own characteristics and project participants are the most important factors affecting project performance.The research results of this paper are conducive to scientific evaluation of the performance of pension PPP projects and promote the further development of the pension industry.
作者 冯之倩 姜军 苏南 Feng Zhiqian;Jiang Jun;Su Nan(School of Economics and Management Engineering,Beijing University of Civil Engineering and Architecture,Beijing 100044;School of Engineering,Yunlin University of Science and Technology,Taiwan,China 64068)
出处 《北京建筑大学学报》 2018年第4期66-73,共8页 Journal of Beijing University of Civil Engineering and Architecture
基金 北京市社会科学基金项目(17GLB018)
关键词 PPP 养老项目 绩效评价 模糊综合评价法 PPP pension project performance evaluation fuzzy comprehensive evaluation method
  • 相关文献

参考文献9

二级参考文献77

共引文献157

同被引文献37

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部