摘要
在渤海油田某井进行水平裸眼井砾石充填过程中,相关作业参数严格按照施工前的模拟设计进行,但仍发生了提前脱砂的情况。本文对脱砂原因进行了分析,并对后续作业提出了建议。
In the gravel packing process of a horizontal open hole well in Bohai Oilfield,the relevant operation parameters are strictly in accordance with the pre-construction simulation design,but the sand out still occurs in advance.This paper analyzes the reasons for sand out and puts forward some suggestions for subsequent operations.
作者
孙飞
Sun Fei(Engineering Technology Branch of CNOOC Energy Development Co.,Ltd,Tianjin 300452)
出处
《石化技术》
CAS
2018年第12期97-97,共1页
Petrochemical Industry Technology
关键词
水平裸眼井
砾石充填
提前脱砂
horizontal open hole
gravel pack
sand out in advance