期刊文献+

中国散裂中子源靶心基板施工技术 被引量:1

Construction Technology of The Bull-Eye Base Plate of China Spallation Neutron Source
下载PDF
导出
摘要 基板是中国散裂中子源靶站的关键部件,为靶站内的设备及部件安装、固定提供稳定可靠的基础,同时基板的中心也是散裂中子源整个装置束流线的核心控制点。基板承重大、安装精度要求极高,为保证基板的安装精度,通过制定合理的施工方案,精心组织,精心施工,达到了业主的工艺要求,很好地完成了施工任务。 The base plate is a key component of the China Spallation Neutron Source target station,which provides a stable and reliable foundation for the installation and fixation of the equipment and components in the target station,while the center of the base plate is also the core control point of the entire device bundle streamline of the spallation neutron source. The base plate is of heavy bearing and high installation precision. In order to guarantee the precision of the base plate installation,the construction task is completed well by making reasonable construction plan,careful organization and careful construction,which meets the owner's technical requirements.
作者 李宏亮 Li Hongliang(Guangdong Provincial Architectural Engineering Machinery Construction Company Guangzhou 510500,China)
出处 《广东土木与建筑》 2019年第1期71-74,共4页 Guangdong Architecture Civil Engineering
关键词 中国散裂中子源 靶心 基板 高精度定型套架 锚杆垂直度精准控制 大型基板的二次灌浆 China Spallation Neutron Source bull eye base plate high-precision set-shaped frame precise control of the verticality of anchor rod secondary grouting of large lase plate
  • 相关文献

参考文献4

二级参考文献5

共引文献18

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部