一种±500 kV换流站现场直流耐压试验装置集成化改造的研究及应用

Research and application of One method of DC voltage test Equipment's integrated transformation in ±500 kV converter Station
下载PDF
导出
摘要 直流耐压试验设备现场需进行多次重复拆卸、移动、组装、试验及装箱运输。为了保证试验设备的可靠性及长途运输的安全性,降低现场组装和拆卸的风险,提升现场试验的效率,以云南电网±500 kV直流输变电工程的现场直流耐压试验为例,提出了一种±500 kV换流站现场直流耐压试验装置集成化改造的方法。 Repeated demolition, movement, assembly, testing and packing are required in DC withstand test. In order to ensure the reliability and long-distance transport of security,reduce the risk of on-site assembly and disassembly, improve the effi ciency of fi eld testing, take DC withstand test of ±500 kV Yong-Fu DC Power transmission project as an example in this paper, a method of integrated retrofi t of DC voltage withstand test device in ± 500 kV converter station is successfully completed.
作者 钟剑明 瞿威均 钱国超 翟兵 ZHONG Jianming;QU Weijun;QIAN Guochao;ZHAI Bing(Electric Power Research Institute, Yunnan Power Grid Corporation, Kunming 650217, China;Nujiang power supply Bureau, Yunnan Power Grid Corporation, Nujiang, Yunnan 673100, China)
出处 《云南电力技术》 2018年第6期94-96,共3页 Yunnan Electric Power
关键词 ±500kV换流站 直流耐压试验 集成化改造 ±500 kV converter Station DC voltage test space charge integrated transformation
  • 相关文献

参考文献7

二级参考文献37

  • 1郭俊,吴广宁,张血琴,舒雯.局部放电检测技术的现状和发展[J].电工技术学报,2005,20(2):29-35. 被引量:254
  • 2李季,罗隆福,许加柱,李勇,姚远.换流变压器阀侧绝缘电场特性研究[J].高电压技术,2006,32(9):121-124. 被引量:44
  • 3JB/T501-2006电力变压器试验导则[s],2006.
  • 4董其国.电力变压器故障与诊断[M].北京:中国电力出版社,2000.
  • 5GB/T7252-2001 变压器油中溶解气体分析和判断导则[S],2001.
  • 6GB 50150-2006 电气装置安装工程电气设备交接试验标准[S],2006.
  • 7DL/T5232-2010±800kV及以下直流换流站电气装置安装工程施工及验收规程[S].2010.
  • 8GB1094.3-2003电力变压器第三部分:绝缘水平、绝缘试验和外绝缘空气间隙[S].
  • 9Q/GDW2752009±800kV直流系统电气设备交接验收试验[S].2009.
  • 10GB/T7595-2008,运行中变压器油质量[S].2008.