摘要
结合京张铁路工程实例,从模板制作、混凝土浇筑、混凝土养护等方面,详细介绍了铁路建设小型混凝土预制件的整个施工过程,可为以后类似标准化预制件生产提供参考。
Combining with the Beijing-Zhangjiakou railway project, the paper introduces the whole construction process of the small concrete prefabricated parts of railway construction from the formwork manufacturing, concrete grouting, and concrete maintenance, so as to provide some reference for the similar standardized prefabricated manufacturing.
作者
张平
Zhang Ping(No.5 Engineering Co.,Ltd. of China Railway Third Bureau Group,Jinzhong 030600,China)
出处
《山西建筑》
2019年第4期98-100,共3页
Shanxi Architecture