摘要
铁塔基础分为普通基础、挖式基础、人工挖孔桩基础、灌注桩基础等,叙述并总结了赞比亚下凯富峡输变线路斜柱插入式角钢的实施过程,并对施工过程中的各种工艺流程进行了探讨,通过探讨总结插入式角钢施工经验,为后期基础施工、铁塔组装等做好准备。
The foundation of the 330 kV tower is divided into ordinary foundation, excavation foundation, artificial digging pile foundation, pouring pile foundation, etc.. This article describes and summarizes the implementation process of the stub angle of the transmission line in Zambia, and various process flows in the process were discussed. By discussing the experience of stub angle construction, we prepared for the foundation construction and tower erection etc..
作者
杨占卫
Yang Zhanwei(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou 450000,China)
出处
《山西建筑》
2019年第4期102-103,共2页
Shanxi Architecture