摘要
介绍了在城市建设测量中,使用全站仪进行数据采集时,自由设站与支导线的方法使用情况。通过对两种方法的比较,得出在全站仪进行数据采集中,自由设站和支导线两种方法联合使用,能大大提高数据采集的效率,以及更加准确的绘制城市地形图。
This paper introduces the use of free station and branch wire in urban construction measurement when using whole station instrument for data collection. By comparing the two methods, it is concluded that the data collection in the whole station instrument, the combination of free station and branch wire, can greatly improve the efficiency of data collection, and more accurately draw the city topographic map.
作者
王晓
Wang Xiao(Lvliang Polytechnic Institute,Xiaoyi 032300,China;Lvliang Coal Industry School,Xiaoyi 032300,China)
出处
《山西建筑》
2019年第4期209-210,共2页
Shanxi Architecture
关键词
数据采集
自由设站
支导线
data collection
free station
branch wire