管幕法下穿既有地铁隧道微变形控制技术 被引量:8

Study on Disturbance of Pipe Curtain Construction in Sandy Cobble Stratum
下载PDF
导出
摘要 依托矿山法新建北京地铁8号线木—大区间正线下穿既有10号线盾构区间工程,采用FLAC3D建立空间三维数值模型对管幕施工及新建地铁隧道下穿既有地铁隧道施工过程进行了数值分析,研究在管幕预支护体系保护下新建地铁双线隧道近距离下穿既有地铁隧道施工对地层扰动变形的影响,并将数值模拟结果同现场监测结果进行了对比分析.结果表明:在管幕预支护体系作用下,新建隧道的施工对上部地层的扰动以沉降为主;新建地铁双线隧道施工中,左、右线隧道施工引起的土层沉降具有叠加效应;在管幕预支护体系作用下进行新建隧道近距离下穿既有隧道施工,能够将既有结构的沉降变形控制在允许范围内. This research relies on shield interval engineering of the construction using the mining method of Beijing Metro Line 8 near the bottom of existing subway tunnel line 10.A three-dimensional numerical model is established by FLAC 3D to analyze the construction process of pipe curtain used in the construction engineering of new subway tunnel under the existing subway tunnel. Under the protection of the pipe curtain pre-support system in the engineering,the influence of the constructing process in new metro double line tunnel near the bottom of existing subway tunnel on the perturbation deformation of the stratum is analyzed,furthermore,the numerical solutions are compared with the field monitoring data. The conclusions can be drawn as following: under the action of the curtain support system, the construction perturbation of new subway tunnel to upper surrounding stratum is mainly stem from the settlement of the upper strata. During the construction of the metro double line tunnel, the subsidence caused by the construction of the left and right tunnels has the superposition effect. Under the action of the pre-support system, the existing structure settlement deformation derived from the constructing of new tunnels near the bottom of existing subway tunnel can be controlled within the allowable range.
作者 陶连金 张倍 刘新建 罗文江 赵辉 TAO Lian-jin;ZHANG Bei;LIU Xin-jian;LUO Wen-jiang;ZHAO Hui(Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education,Beijing University of Technology,Beijing 100124;Center of Cooperative Innovation for Beijing Metropolitan Transportation,Beijing 100124;Beijing Rail Transit Construction Management Co., Ltd., Beijing 100124;China Railway 19 Bureau Group Co., Ltd.,Beijing 100124 China)
出处 《湘潭大学学报(自然科学版)》 CAS 2018年第5期86-94,共9页 Journal of Xiangtan University(Natural Science Edition)
基金 国家自然科学基金项目(41572276)
关键词 管幕法 下穿施工 施工扰动 微变形控制 数值模拟 pipe curtain method under-crossing construction construction disturbance micro deformation control numerical simulation
  • 相关文献

参考文献9

二级参考文献32

共引文献226

同被引文献55

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部