摘要
在露天矿的生产工作中,穿孔效率低以及出现大块等问题一直困扰着施工工作,还需要从爆破技术以及管理方法中寻找解决办法。为此简单的分析了穿孔爆破工作技术,然后对施工管理的方法进行了全面的分析,从技术和管理两个方面提升采矿工程质量。
In the production of open-pit mine,the problems of low perforation efficiency and large blocks have been puzzling the construction work,and solutions need to be found from blasting technology and management methods.For this reason,the working technology of perforated blasting is simply analyzed,and then the method of construction management is comprehensively analyzed,so as to improve the quality of mining engineering from two aspects of technology and management.
作者
魏忠原
WEI Zhong-yuan(Mining Industry Branch of Benxi Iron and Steel(Group)Construction Co.,Ltd.,Benxi 117000,China)
出处
《世界有色金属》
2018年第21期144-144,146,共2页
World Nonferrous Metals
关键词
露天矿
穿孔爆破
工作技术
open pit mine
perforated blasting
working technology