摘要 在高寒高海拔条件下的矿井,井筒加热防冻是保证安全生产的重要措施。根据某矿山实际情况计算了井口加热所需热负荷、回风井巷可回收乏风热量,设计了利用回风源热泵机组回收乏风热量进行井口加热的系统,解决了矿井防冻问题,有效降低了能耗,是实现绿色矿山建设的途径之一。 In the mine under the condition of high altitude and cold,the freezing prevention of shaft heating is an important measure to ensure safe production.According to the actual situation of a mine,the heat load required for wellhead heating and the recoverable heat of exhaust air in return air shaft and roadway are calculated.A system for wellhead heating using exhaust heat recovery by return air source heat pump unit is designed,which solves the problem of mine frost prevention and effectively reduces energy consumption.It is one of the ways to realize green mine construction.
作者 张继业 ZHANG Ji-ye(School of safety science and engineering,Henan Polytechnic University,Jiaozuo 454000,China;China en Fei Engineering Technology Co.,Ltd.,Beijing 100038,China)
出处 《世界有色金属》 2018年第20期49-50,52,共3页 World Nonferrous Metals
关键词 高寒高海拔矿井 井口防冻 风源热泵 绿色矿山 热耗计算 high cold and high elevation mine wellhead antifreeze air source heat pump green mine heat consumption calculation
  • 相关文献

参考文献1

二级参考文献8

共引文献1

同被引文献34

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部