摘要 随着BIM技术的广泛应用,越来越多的单位愿意采用三维动态施工工艺展示方法来解读项目中的施工技术。但目前施工工艺动画仍然存在着可复用性低、调整复杂且制作周期长等缺陷。我们通过对文字、序列、静态展示、动态展示、BIM模型等在施工工艺展示中的技术优劣势进行分析,结合多源数据的共享这一角度,实现"文字+图片+BIM模型+视频"四位一体施工工艺大数据库的精准创建。 With the wide application of BIM technology,more and more companies are willing to adopt the 3D dynamic construction technology demonstration method to interpret the construction technology in the project.However,at present,there are still some defects in current construction process animation,such as low reusability,complex adjustment and long production cycle.By analyzing the technical advantages and disadvantages of text,sequence,static display,dynamic display and BIM model in the construction technology display,and combining the perspective of sharing multi-source data,we can achieve the precise creation of "text + picture + BIM model + video" four-in-one construction technology big database.
作者 蒋绮琛 李鑫 于鑫 陈滨津 Jiang Qichen;Li Xin;Yu Xin;Chen Binjin(China Construction Eighth Engineering Division Corp.,Ltd.,Shanghai 200122,China)
出处 《土木建筑工程信息技术》 2018年第6期50-54,共5页 Journal of Information Technology in Civil Engineering and Architecture
基金 国家重点研发计划项目"建筑围护材料性能协同提成关键技术研究与应用"(编号:2016YFC0700800)
关键词 BIM技术 多源数据 施工工艺数据库 BIM Technology Multi-Source Data Construction Process Database
  • 相关文献

参考文献6

二级参考文献30

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2景保福.城市地下输电工程探讨[J].上海电气技术,2012,5(1):54-57. 被引量:7
  • 3隋振国,马锦明,陈东,徐伟.BIM技术在土木工程施工领域的应用进展[J].施工技术,2013,42(S2):161-165. 被引量:98
  • 4徐光明,麦范金.CAD曲面网格建模方法[J].机械设计与制造,2007(10):81-82. 被引量:1
  • 5Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 6Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 7Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 8Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 9Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 10Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.

共引文献779

同被引文献28

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部