济青高铁淄博至潍坊BIM施工全过程应用 被引量:2

Application of BIM Construction Process in Zibo-Weifang Section of Jiqing High-Speed Railway
下载PDF
导出
摘要 济青高铁是国家规划"八纵八横"客运通道的重要组成部分,是山东省"三横五纵"快速铁路网的"脊梁骨"。本项目站房具有结构造型新颖、工期任务重、管线施工复杂等特点,利用BIM技术旨在全方位提高项目管控力度,实现精细化管理。本文介绍淄博北站、潍坊北站应用BIM技术进行安装管线、幕墙、装饰装修深化设计,应用济青高铁BIM平台实现多专业融合、安全质量管理、成本控制、变更管理等,引入最新的VR技术、三维扫描技术、智慧工地系统等助力项目优质高效完成施工任务。本项目通过BIM技术应用,全面提高项目管理水平,精准控制项目造价,简化项目管理流程,实现项目全生命周期的综合性管控,为企业后续承建铁路站房项目的 BIM技术应用提供可参考的实施方案。 The Jinan-Qinghai high-speed railway is an important part of the national planning of the "eight vertical and eight horizontal" passenger transport corridor,and is also the "backbone" of the "three horizontal and five vertical" high-speed railway network in Shandong Province.The station buildings of this project possess the characteristics of novel structure,heavy construction task and complicated pipeline construction.Through the BIM application,the project is aiming at improving all-round project management and control,and achieving fine management as well.This paper introduces the application of BIM technology Zibo North Railway Station and Weifang North Railway Station,specifically,in installation deepening design of pipeline,curtain wall and indoor decoration.The BIM platform of Jinan-Qinghai High-speed Railway is applied to realize multi-professional integration,safety and quality management,cost control,change management,and etc.Latest VR technology,3D scanning technology,intelligent site system and other supporting projects is also introduced assisting projects to complete the construction task with high quality and efficiency.Through the application of BIM technology,the project comprehensively improves the project management level,precisely controls the project cost,simplifies the project management process,realizes the comprehensive management and control of the whole life cycle of the project,and provides a reference implementation scheme for the application of BIM technology in the subsequent construction of railway station building projects.
作者 张堃 刘晓静 高世超 刘昭 Zhang Kun;Liu Xiaojing;Gao Shichao;Liu Zhao(Shandong Branch Office of China Railway Construction Engineering Group Co.,Ltd.,Qingdao 266000,China;Jiqing High-Speed Railway Co.,Ltd.,Jinan 250000,China;Jinan Design Institute,China Railway Engineering Design Consulting Group Co.,Ltd.,Jinan 250000,China)
出处 《土木建筑工程信息技术》 2018年第6期74-79,共6页 Journal of Information Technology in Civil Engineering and Architecture
关键词 站房BIM应用 济青高铁BIM平台 BIM深化设计 BIM Application in Station Building BIM Platform of Jinan-Qingdao High-Speed Railway BIM Deepening Design
  • 相关文献

参考文献2

二级参考文献8

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 3Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 4Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 5Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 6Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 7Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 8Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.

共引文献639

同被引文献19

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部