期刊文献+

BIM技术在合肥新四中项目施工阶段的应用与研究 被引量:5

Research on Application of BIM Technology in Construction Stage of New Campus Project of Hefei 4th Middle School
下载PDF
导出
摘要 合肥新四中项目位于合肥市滨湖区,是合肥市重点工程项目。本文介绍了合肥新四中的项目概况及BIM(Building Information Modeling)技术在其施工过程中的应用情况及应用效果。在该工程全施工阶段中BIM技术的应用情况涵盖三维管线综合、工程量统计、可视化编程、VR安全教育、BIM项目管理平台等诸多方面。基于三维信息模型的上述应用在整个项目建设过程中发挥了巨大作用,不仅在施工进程中提高了工程施工质量,缩减施工成本,节约施工工期,亦对建筑投入使用后的运营维护起到了极大的助力。 Located at the Binhu District of Hefei,the new campus project of hefei 4th middle school is a city-level key project in Hefei.This paper introduces the general information of the new campus project,as well as the BIM (Building Information Modeling) application in and its effect on the construction stage of the project.For the whole progress of the construction,the BIM application includes many aspects of 3D pipeline synthesis,engineering quantity statistics,visual programming,VR safety education,BIM program management platform,and etc.Above applications based on the 3D information model have played significant roles in the construction progress of the whole project,which not only improves the construction quality,but also reduces the construction cost and the construction period.In addition,the BIM application also contributes to the operation and maintenance of the building after the delivery.
作者 葛玥 刘长城 卢光天 郁磊 郑忠 Ge Yue;Liu Changcheng;Lu Guangtian;Yu Lei;Zheng Zhong(Anhui Guohua Construction Project Management Co.,Ltd.,Heifei 230000,China)
出处 《土木建筑工程信息技术》 2018年第6期86-90,共5页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM 全施工周期 VR 可视化编程 BIM Whole Construction Period VR Visual Programming
  • 相关文献

参考文献3

二级参考文献33

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2满庆鹏,李晓东.基于普适计算和BIM的协同施工方法研究[J].土木工程学报,2012,45(S2):311-315. 被引量:40
  • 3贺灵童.BIM在全球的应用现状[J].聚焦信息化,2013(3):12-19.
  • 4住房和城乡建设部.2011-2015年建筑业信息化发展纲要[z].2011.
  • 5Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 6Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 7Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 8Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 9Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 10Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.

共引文献801

同被引文献25

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部