期刊文献+

配网自动化建设对供电可靠性的影响

Influence of distribution network automation construction on power supply reliability
下载PDF
导出
摘要 随着社会的不断发展,电能成为人们日常生活中不可替代的一部分,近年来各电力用户对电力供应提出的要求越来越严格,这种情况下科技人员必须充分认识到提升配网自动化管理水平的重要性,加大力度提升供电系统可靠性。文章从配网自动化建设的意义出发,分析配网自动化系统的功能,研究配网自动化对供电可靠性的影响,希望可以借此给相关的研究提供一定的参考意见。
作者 郭海波 Guohaibo
出处 《今日自动化》 2018年第4期27-28,共2页 Automation Today
  • 相关文献

参考文献4

二级参考文献22

  • 1王凯勋.探讨提高配电网供电可靠率的措施[J]城市建设理论研究(电子版),2013(19).
  • 2Roy Billinton,Satish Jonnavithula.A test system for teaching overall power system reliability assessment. IEEE Transactions on Power Systems . 1996
  • 3Sheen, J.-N.,Chen, C.-S.,Wang, T.-Y.Response of large industrial customers to electricity pricing by voluntary time-of-use in Taiwan. Generation, Transmission and Distribution, IEE Proceedings- . 1995
  • 4Sheen, J.N.,Chen, C.S.,Yang, J.K.Time-of-use pricing for load management programs in Taiwan power company. IEEE Transactions on Power Systems . 1994
  • 5Reynolds, S.P.,Creighton, T.E.Time-of-use Rates for Very Large Customers on the Pacific Gas and Electric Company System. Power Apparatus and Systems, IEEE Transactions on . 1980
  • 6AALAMI H,MOGHADAM M P,YOUSEFI G R.Optimum time of use program proposal for Iranian power systems. International Conference on Electric Power and Energy Conversion Systems . 2009
  • 7U.S.Department of Energy.Benefits of demand response in electricity markets and recommendations for achieving them:a report to the United State Congress pursuant to section 1252of the Energy Policy Act of 2005[R/OL]. . 2008
  • 8Federal Energy Regulatory Commission.Assessment of demand response and advanced metering:2006staff report[R/OL]. . 2008
  • 9Federal Energy Regulatory Commission.Assessment of demand response and advanced metering:staff report[R/OL]. . 2008
  • 10Federal Energy Regulatory Commission.A national assessment of demand response potential:staff report[R/OL]. . 2009

共引文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部