摘要 基于上海市公交充电站及公用充电桩的建设和运营基本情况,收集4个公交充电站直流充电机(60kW一体式一机两充)和63个公用充电桩(直流10kW充电桩和交流3.5kW充电桩)的设施投资及成本数据,在考虑收益(服务费收入、补贴收入)和税金的基础上,提出经营期内(一般为10年)公交充电站和公用充电桩年均运行总成本及内部收益率的核算方法;以实例分析了典型项目的经济效益。通过测算,得出已建公用充电设施即使在享受现有补贴的前提下,财务效益尚不理想。建议通过政策导向,加大对充电设施建设项目的补贴力度。本文的测算方法可为充换电设施建设单位测算项目的成本及经济效益提供参考。 This paper,based on the basic situation of construction and operation of bus charging stations and public charging piles in Shanghai,collected 4 bus stations DC charging machine(60 kW one-piece two charge)and 63 public charging piles(10 kW DC charging piles and 3.5 kW AC charging piles)of infrastructure investment and cost data,On the basis of service fee income,subsidy income and tax,this paper puts forward the accounting method of annual average operation total cost and internal rate of return of bus charging stations and public charging piles during the operation period(usually 10 years);The economic benefits of typical projects are analyzed with examples.Through calculation,it is concluded that the financial benefits of established public charging facilities are not ideal even if they enjoy the existing subsidies.It is suggested to increase the subsidy for charging facilities construction projects through policy guidance,and the calculation method in this paper can also provide a reference method for charging and replacement facilities construction units to calculate the cost and economic benefits of projects.
作者 蒲军军 Pu Junjun(Shanghai Energy-Saving and Emission-Rducing Center Co.,Ltd.)
出处 《上海节能》 2019年第1期70-76,共7页 Shanghai Energy Saving
关键词 公交充电站 公用充电桩 运行成本核算 核算方法 Bus Charging Station Public Charging Pile Operation Cost Accounting Accounting Method
  • 相关文献

同被引文献38

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部