期刊文献+

基于FP-growth算法的轨道交通系统全生命周期成本要素交互影响研究 被引量:1

Research on Interaction Effect of Whole Life Cycle Cost Elements of Rail Transit System Based on FP-growth Algorithm
下载PDF
导出
摘要 轨道交通系统全生命周期投资大、建设周期长、成本要素众多且关联关系复杂。文章以安全域为边界,对轨道交通系统全生命周期总成本基于安全域、性能域、环境域进行分类,设计了一种改进的FP-growth算法,对各域成本要素之间的关联关系展开研究分析,通过带入实际数据,利用基于FP-growth算法的轨道交通系统全生命周期多域成本要素交互影响研究模型,来分析各域之间的交互影响规律。 The rail transit system has a large life cycle investment,a long construction period,numerous cost factors and complex relationship.This paper classified the total life cycle cost of rail transit system based on security domain,security domain,performance domain and environment domain.An improved FP-growth algorithm was designed to analyze the relationship between cost components in each domain.By introducing the actual data,the FP-growth algorithm-based rail transit system full life cycle multi-domain cost element interaction research model was used to analyze the interaction law between domains.
作者 张馨雨 杨基宏 赖森华 徐刚 杨宇翔 刘辉 ZHANG Xin-yu;YANG Ji-hong;LAI Seng-hua;XU Gang;YANG Yu-xiang;LIU Hui(School of Traffic&Transportation Engineering,Central South University,Changsha,Hunan 410075,China;CRRC Sifang Co.,Ltd.,Qingdao,Shandong 266111,China)
出处 《企业技术开发》 2018年第12期39-43,共5页 Technological Development of Enterprise
基金 国家重点研发计划课题“轨道交通系统全生命周期成本关键要素辨识与分析方法研究”(2017YFB1201101)
关键词 安全域 FP-GROWTH 轨道交通 全生命周期 Security domain FP-growth Rail transit Full life cycle
  • 相关文献

参考文献9

二级参考文献42

  • 1冯志新,钟诚.基于FP-tree的最大频繁模式挖掘算法[J].计算机工程,2004,30(11):123-124. 被引量:18
  • 2李丽敏,顾天鸿,陈进杰.关于降低我国地铁造价的探讨[J].国防交通工程与技术,2005,3(4):6-8. 被引量:4
  • 3陈旻瑜.地铁运营成本特性分析[J].现代城市轨道交通,2006(4):91-93. 被引量:21
  • 4吉炳安,罗云峰,汤懿芳.基于定额的国防采购R&D成本补偿模型研究[J].管理工程学报,2007,21(1):127-130. 被引量:4
  • 5HartJW,KamberM.数据挖掘概念与技术.北京:机械工业出版社,2006.
  • 6北京交通大学,北京城建设计研究总院有限公司.降低地铁造价及工程建设管理等若干问题的研究[R].北京:北京交通大学,2003.
  • 7KISHK M, Al-HAJJ A. Fuzzy modelling of life cycle costs of alternatives with different lives [C]// Glasgow Caledonian University. The 16th Annual Conference of the Association of Researchers in Construction Management (ARCOM). Glasgow: IEEE, 2000: 92-101.
  • 8ERTO P, LANZOTTI A. Statistical model life cycle costreliability for a new mass transit vehicle[C]//Wessex Institute of Technology. Proceedings of the 4th International Conference on Computer Aided Design, Manufacture and Operation in the Railway and Other Mass Transit Systems. Southampton: Computational Mechanics Publ, 1994 : 102-109.
  • 9KISHK M, Al-HAJJ A. A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making[J]. Journal of Financial Management of Property and Construction, 2000, 5(1/2): 93-104.
  • 10JUN H K, KIM J H. Life cycle cost modeling for railway vehicle[C]//Korea Railroad Research Institute. Proceeding of International Conference on Electrical Machines and Systems. Seoul: IEEE, 2007: 1989-1994.

共引文献139

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部