期刊文献+

正交数值模拟试验法在无底柱分段崩落法采场结构优化中的应用

Application of Orthogonal Numerical Simulation Test in Optimization of Stope Structure in Pillarless Sublevel Caving
下载PDF
导出
摘要 分段高度和进路间距及崩矿步距是影响无底柱分段崩落法回收率的3个重要因素。文章结合四川某铁矿生产条件及先期试验成果,运用正交数值模拟试验,对通过正交组合试验确定的9组不同的结构参数模型进行研究分析,最终推荐该铁矿采场采用的最优结构参数为:分段高度20 m、进路间距18 m、崩矿步距3 m。 The three important factors affecting the recovery rate of the pillarless sublevel caving are sublevel height,between-access space and caving step distance.According to production conditions and preliminary test results of an iron mine in Sichuan province,and by using the orthogonal numerical simulation experiment,9 groups of models with different structure parameters determined by orthogonal combination test were investigated and analyzed.The optimal structure parameters for the iron ore stope are finally recommended as sublevel height 20 m,between-access space 18 m,and caving step distance 3 m.
作者 马秋 苟桂森 李锦峰 Ma Qiu;Gou Guisen;Li Jinfeng(Kunming Engineering & Research Institute of Nonferrous Metallurgy Co.,Ltd.,Kunming 650051,China;The Branch in Kunyang of Yunnan Phosphate Chemical Group Co.,Ltd.,Kunming 650600,China)
出处 《有色金属设计》 2018年第4期60-63,共4页 Nonferrous Metals Design
关键词 无底柱分段崩落法 正交试验 结构参数 Pillarless sublevel caving Orthogonal test Structure parameters
  • 相关文献

参考文献4

二级参考文献34

共引文献1097

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部