7Shah J, Avittathur B. The retailer multi-item inventory problem with demand cannibalization and substitution[J]. International Journal of Production Economics, 2007, 10(6): 104-114.
8Jung W. Recoverable inventory systems with time-varying demand[J]. Production and Inventory Management Journal, 1993, 34(1): 77-81.
9Aharon B, Boaz G, Shimrit S. Robust multi-echelon multi-period inventory control[J]. European Journal of Operational Research, 2009, 19(2): 922-935.
10Kilpi J, Toyli J, Vepsalainen A. Cooperative strategies for the availability service of repairable aircraft compo- nents[J]. International Journal of Production Economics, 2009, 117(2): 360-370.