BIM技术在陆运河船闸工程进度管理中的应用 被引量:1

Application of BIM technology in the schedule management of Lu canal ship lock project
下载PDF
导出
摘要 针对陆运河船闸工程工期紧、技术要求高、工程量大等特点,项目部运用Revit软件建立船闸三维可视化模型,将建好的三维模型导入到广联达BIM5D施工管理平台,与进度计划、工程量清单及场地模型关联生成5D模型。结合广联达BIM5D软件对施工进度进行施工模拟及优化。陆运河船闸工程成功运用BIM技术,有效缩短了工期,节约了成本。 In view of the characteristics of the Lu canal ship lock project,such as tight construction period,high technical requirements and large amount of work,the project department used Revit software to build a threedimensional visualization model of the ship lock by,imported the built three-dimensional model into the BIM5D construction management platform of Guanglianda,and generated a 5D model associated with the schedule plan,the bill of quantities and the site model.Combined with the BIM5D software of Guanglianda,the construction progress was simulated and optimized.The successful application of BIM technology in the Lu canal ship lock project had effectively shortened the construction period and saved the cost.
作者 顾永明 孙建东 周强 GU Yongming;SUN Jiandong;ZHOU Qiang(Jiangsu Hydraulic Engineering Construction Co.,Ltd.,Yangzhou 225002,Jiangsu)
出处 《江苏水利》 2019年第1期26-31,共6页 Jiangsu Water Resources
关键词 建筑信息模型 5D模型 施工模拟 进度管理 building information model 5D model construction simulation schedule management
  • 相关文献

参考文献2

二级参考文献10

共引文献28

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部