主要对黑麋峰抽水蓄能电站引水流道主洞、岔管、引水支洞等部位的围岩变形、应力监测、渗压等的变化过程及规律进行分析总结,并参照现场检查的具体情况判断引水流道运行的基本状况,为后续流道安全稳定运行提供有效保障。
This paper mainly analyzes and summarizes the change processes and laws of surrounding rock deformation,stress monitoring and seepage pressure of the main diversion tunnel,bifurcated penstock and branch diversion tunnel of Heimifeng Pumped Storage Power Station,and judges the basic operation conditions of the diversion tunnel with reference to on-site specific conditions,so as to provide effective guarantee for safe and stable operation of the diversion channel.
作者
汤巍
陈玉娇
刘源
庞希斌
祝加勇
TANG Wei;CHEN Yu-jiao;LIU Yuan;PANG Xi-bin;ZHU Jia-yong(Hunan Heimifeng Pumped Storage Power Co.,Ltd. of State Grid Xinyuan Company Limited,Changsha 410213,China)
出处
《水电站机电技术》
2019年第2期36-39,44,95,共6页
Mechanical & Electrical Technique of Hydropower Station
关键词
引水流道
运行状况
监测
现场检查
Diversion channel
Operation condition
Monitoring
On-site inspection