摘要
描述在铁路编组站综合自动化系统、CTCS-2系统与联锁系统关系,分析编组站同时引入编组站综合自动化系统与CTCS-2系统时出现的联锁系统控制权和线路区间信息交互问题,并提出工程解决方案建议。
This paper describes the relationship between Computer Integraitem Process System(CIPS) for marshalling station, CTCS-2 system and interlocking system, analyzes the interlocking system control and the information interaction in line section when CIPS and CTCS-2 system are introduced in marshalling station, and proposes the engineering solutions.
作者
李志兵
赵永海
王钟巍
Li Zhibing;Zhao Yonghai;Wang Zhongwei(Beijing National Railway Research & Design Institute of Signal & Communication Group Co., Ltd., Beijing 100070, China;Beijing Engineering Technology Research Center of Operation Control Systems for High Speed Railways, Beijing 100070, China)
出处
《铁路通信信号工程技术》
2019年第2期18-22,共5页
Railway Signalling & Communication Engineering