摘要 随着生产的进行,望儿山金矿中深孔采场回采结束,需要对所预留的底柱进行回收。如何安全高效的回收底柱是摆在矿山面前的一大难题。同时底柱回收方案决定着采场一分段的采矿方法。本文提出了三种方案,一是进路施工中深孔采场第一分层并铺设假底,进路法回收底柱;二是中深孔采场直接崩落,进路法回收底柱;三是中深孔采场直接崩落,崩落法回收底柱。通过经济效益及安全性对比决定采用中深孔采场直接崩落,崩落法回收底柱。 As production proceeds,the mining of medium-deep hole stope in wangershan gold mine is over,need to recycle the reserved bottom column,how to safely and efficiently recover the bottom pillar is a big problem in front of the mine,the bottom pillar recovery scheme determines the mining method of the section one stop.Three schemes are proposed in this paper,firstly,the first layer of deep-hole stope is laid with false bottom in road construction,recovery of bottom pillar by route method;the second is the direct caving of medium-deep hole stope,recovery of bottom pillar by route method;third,the direct caving of medium-deep hole stope,recovery of bottom pillar by route method.Through the comparison of economic benefit and safety,it is decided to adopt medium-deep hole stope caving directly,recovery of bottom pillar by route method.
作者 张忠辉 ZHANG Zhonghui
出处 《中国矿山工程》 2019年第1期25-28,共4页 China Mine Engineering
关键词 底柱 中深孔采场 采矿方法 bottom pillar medium-deep hole stope mining method
  • 相关文献

同被引文献15

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部