柳树坪电站导水机构结构和功能的改进处理 被引量:2

Structural and Functional Renovation of the Water Guide Mechanism in Liushuping Hydropower Station
下载PDF
导出
摘要 针对柳树坪水电站出现的剪断销频繁剪断的问题,通过对系统深入分析,确定是拐臂端盖上导叶顶丝功能缺陷、导叶止推装置结构缺陷、底环泄压孔缺失等原因造成导叶上浮与顶盖剐蹭,使剪断销受力过大而频繁剪断。对此制定了相应的改进预案和措施,经检修中进行相应的处理,从根本上解决了剪断销频繁剪断的问题,提高了机组运行的稳定性。 Breaking of the shear pins in the water guide mechanism of generator unit is frequently observed in Liushuping Hydropower Station. In-depth analysis shows that the functional defect of the upper guide vane screw, the structural defect of the guide vane thrust device and the lack of the pressure relief hole in the bottom ring are major reasons, which cause the up-floating of the guide vane and scraping with the top cover, and finally the breaking of shear pins due to excessive shearing force. Correspondingly, renovation measures and treatment plans are made. In practical maintenance, the unit is renovated and the problem is successfully solved.
作者 谢斐 李权 姚文俊 任超 XIE Fei;LI Quan;YAO Wenjun;REN Chao(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
出处 《水电与新能源》 2019年第2期51-54,共4页 Hydropower and New Energy
关键词 柳树坪水电站:导水机构 剪断销 原因分析 处理预案 改进措施 Liushuping Hydropower Station water guide mechanism shear pin cause analysis treatment plan improvement measures
  • 相关文献

参考文献3

共引文献4

同被引文献8

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部