价格变化下PPP项目残值风险预测研究 被引量:1

Research on Residual Value Risk Prediction of Public-Private-Partnership Projects under the Changing Price
下载PDF
导出
摘要 分析PPP项目价格变化对项目残值风险的影响,并将PPP项目残值风险分解为经济价值残值风险和社会价值残值风险,构建价格变化下的残值风险计算模型。在此基础上,以香港西遂项目为案例,运用时间序列理论,预测价格影响因素的变化,进而对残值风险进行预测,验证该模型的有效性。 The paper analyzes the effect of projects’ price change on PPP projects,decomposes residual-value risk in PPP project into economic value residual risk and social value residual risk,and constructes a prediction framework of PPP projects’ residual-value risk. On the basis,takes Hongkong Xisui project as an example,predicts the changes of price influencing factors with time series analysis,and predicts the residual-value risk,to prove the effectiveness of the model.
作者 张亚静 袁竞峰 程立 李启明 ZHANG Yajing;YUAN Jingfeng;CHENG Li;LI Qiming(School of Civil Engineering,Southeast University,Nanjing 210096,China;Huafa Industrial Share Nanjing Company,Nanjing 211100,China)
出处 《建筑经济》 北大核心 2019年第1期51-57,共7页 Construction Economy
基金 国家自然科学基金面上项目"PPP项目社会风险的机理分析 动态评估与综合治理研究"(71472037) 国家自然科学基金青年项目"基础设施PPP项目残值风险动态预测与监控方法研究"(71001027)
关键词 PPP模式 残值风险 价格变化 风险预测 PPP mode residual-value risk price changes risk prediction