8FAY R, TRELOAR G, IYER-RANIGA U. Life-cycle energy analysis of buildings.. A case study[J].Building Re- search and Information, 2000,28 (1) ; 31-41.
9CHAPMAN C B, COOPER D. Risk engineering approach basic controlled interval and memory models[J]. Journal of Operation Research, 1983,34(1) : 51-60.
10Pietroforte R,Miller J B. Prccurement methods for US iafrastructure:historical perspectives and recent trends[J].BUILDING RESEARCH AND INFORMATION,2002,(06):425-434.