期刊文献+

长距离供水管道停泵水锤计算与分析 被引量:5

Calculation and Analysis of Pumping-Off Water Hammer in Long-Distance Water Supply Pipelines
下载PDF
导出
摘要 长距离供水管道运行中极易发生水锤事故。结合工程实例,采用水锤模拟软件对停泵水锤进行模拟,结果表明,针对第一段供水管道选择普通排气阀和箱式双向调压塔作为水锤防护措施,能有效控制水锤,保障供水安全。 During the operation of long-distance water supply pipeline, the accidents of water hammer are easy to occur. Combined with engineering example,the water hammer simulation software is used to simulate pumping-off water hammer, the result shows that the common exhaust valve and box type two-way surge tank can effectively control water hammer and ensure the safety of the first section water supply pipeline.
作者 刘加强 张建昆 王萧 倪宁 张强 LIU Jiaqiang;ZHANG Jiankun;WANG Xiao;NI Ning;ZHANG Qiang(School of Environmental Engineering, Xuzhou Institute of Technology, Xuzhou221111, China;Xuzhou Municipal Design and Research Institute Co., Ltd., Xuzhou221002, China;Water Management Office of Xuzhou Economic and Technological Development Zone, Xuzhou221000, China)
出处 《净水技术》 CAS 2019年第2期121-124,共4页 Water Purification Technology
基金 住房和城乡建设部项目(2010-k7-4) 徐州工程学院校科研课题(XKY2016230)
关键词 长距离供水管道 水锤模拟 水锤防护 long-distance water supply pipeline water hammer simulation water hammer protection
  • 相关文献

参考文献6

二级参考文献19

共引文献41

同被引文献37

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部