摘要
安哥拉卡宾达地区有优质的海岸线,但码头资源非常匮乏。本文以卡宾达一新建港口工程为依托,比较中英规范标准对钻孔灌注桩竖向承载力的计算结果与现场试桩结果的不同,发现采用英国标准更接近现场试桩结果,并对建筑桩基技术规范中砂土地基中桩基承载力公式进行修正。对今后类似工程建设有一定的借鉴作用。
Cabinda of Angola possesses high quality coastline but scarce port resources.Based on new-built Cabinda port project,the field pile test result is compared with the calculation result of vertical bearing capacity of cast-in-place pile specified in Chinese and British Standard respectively,which shows the calculation result of British Standard being closer to the field pile test result,and leads to the formula correction of pile foundation bearing capacity for sandy soil specified in Technical Code for Building Pile Foundations.The above will serve as a reference for similar projects in the future.
作者
张瑞棋
诸葛爱军
黎双邵
Zhang Ruiqi;Zhuge Aijun;Li Shuangshao(Tianjin Port Engineering Institute Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300222,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;Key Laboratory of Port Geotechnical Engineering of the Ministry of Communication,Tianjin 300222,China;Key Laboratory of Port Geotechnical Engineering of Tianjin,Tianjin 300222,China)
出处
《港工技术》
2019年第1期97-100,共4页
Port Engineering Technology
关键词
砂土
钻孔灌注桩
竖向承载力
规范
码头
港口
sandy soil
cast-in-place pile
vertical bearing capacity
standard
wharf
harbor