期刊文献+

水文地质勘查中常见的难点及对策 被引量:2

Common Difficulties and Countermeasures in Hydrogeological Exploration
下载PDF
导出
摘要 在建筑工程项目开展的过程中要注重对水文和地质的勘查,这项工作的开展为后期施工奠定良好基础。但地质水文勘探工作在建筑工程项目当中是较为复杂的一项工作,技术要求较高,对地下勘探的各类物质要求全面性完整性。我国建筑工程项目数量不断增多,勘探技术应用次数增长,经验和技术的提升和优化,就需要相关企业勘探部门根据实际施工中的缺陷进行弥补,从而为地质勘探工作的发展提供源源不断的动力。 In the process of construction project development, we should pay attention to hydrological and geological exploration, which lays a good foundation for later construction. However, geological and hydrological exploration is a relatively complex work in construction projects, which requires high technical requirements and comprehensive integrity of various substances for underground exploration. With the increasing number of construction projects, the increasing number of application of exploration technology, the upgrading and optimization of experience and technology, the exploration departments of relevant enterprises need to make up for the defects in actual construction, so as to provide continuous impetus for the development of geological exploration work.
作者 张嵩月 李杰 ZHANG Song-yue;LI Jie(No. 7 Geological Brigade of Hebei Geological and Mining Bureau, Langfang 065201,China)
出处 《世界有色金属》 2018年第24期182-182,184,共2页 World Nonferrous Metals
关键词 水文地质勘查 难点 对策 hydrogeological exploration difficulties Countermeasures
  • 相关文献

参考文献2

二级参考文献9

共引文献2

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部