抹子沟水库除险加固工程设计 被引量:1

Design of reinforcement project for Mozigou Reservoir
下载PDF
导出
摘要 抹子沟水库自投入运行以来,至今已34年,由于历史原因,当时工程施工质量差,上、下游坝坡抗滑稳定不满足规范要求,溢洪道破损严重,加之工程老化失修,多年来一直带病运行。针对水库存在的主要问题,进行了除险加固。工程加固后,取得了较好的效益。 Since the operation of the Mozigou Reservoir,it has been 34 years,due to historical reasons,the project construction quality is poor at that time,the upper and lower reaches of the dam slope sliding stability does not meet the requirements of the specification,the spillway damage is serious,coupled with the aging of the project in disrepair,for many years has been running with the disease.In view of the main problems existing in the reservoir,the reinforcement is carried out.After the reinforcement,good benefit has been obtained.
作者 康亚静 KANG Ya-jing(Hebei Research Institute of Investigation&Design of Water Conservancy&Hydropower,Shijiazhuang 050081,China)
出处 《水科学与工程技术》 2019年第1期56-60,共5页 Water Sciences and Engineering Technology
关键词 抹子沟水库 除险加固 效益分析 Mozigou Reservoir reinforcement benefit analysis
  • 相关文献

参考文献1

二级参考文献7

共引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部