摘要
忻州窑矿11-2#层西二盘区8939工作面为一孤岛综采放顶煤工作面。8939工作面回采过程中需要过空巷。在空巷支设五排(排间距为0.8m×1.0m)单体柱补强原支护措施,顺利完成了回采。利用KJ216A监测系统和YHY-60B矿山压力连续记录仪,对顶板进行监测和管理。
The 8939 working face in the west 2nd panning area of No. 11-2 layer of Xinzhouyao Coal Mine is an island fully mechanized top coal mining and caving working face. 8939 working face needs to cross the goaf in the process of mining. Five rows of single pillars (row spacing is 0.8m × 1.0m) were installed in the empty roadway to reinforce the original support measures, and the mining was successfully completed. The roof is monitored and managed by KJ216A monitoring system and YHY-60B mine pressure continuous recorder.
作者
徐文平
Xu Wen-ping(Xinzhouyao Mine, Datong Coal Mine Group Co., LTD., Shanxi Datong 037021)
出处
《山东煤炭科技》
2019年第2期22-23,共2页
Shandong Coal Science and Technology
关键词
综采
空巷
工艺
fully mechanized mining
empty roadway
technology