摘要
针对高瓦斯矿井产量大、存在瓦斯突出和爆炸危险,研究分析大采高综采工作面卸压瓦斯运移规律,提出U+I型通风、顺层钻孔抽采本煤层瓦斯和走向高抽巷抽采的综合治理技术。结果表明:对采空区、本煤层和邻近层及工作面顶板裂隙带内瓦斯抽放效果良好,实测工作面瓦斯浓度和抽采率分别为0.265%和83.3%,满足安全生产要求。
For high-gas coal mine production, and the presence of gas outburst and explosion hazard, theoretical analysis has obtained the law of relieving pressure and gas migration in fully-mechanized high-cutting fully mechanized mining face, and proposes the U+I type ventilation and the parallel drilling to extract the gas and driving direction of the coal seam. Comprehensive controlling optimization technology for drainage of high drainage roadway. The results show that the proposed comprehensive treatment technology can realize the gas in the goaf, the coal seam and the adjacent layers and the cracks in the adjacent roof, and the industrial experiment. The gas concentration and extraction rate in the working face were 0.265% and 83.3%, respectively, which met the safety production requirements of the working face.
作者
刘晓辉
Liu Xiao-hui(Lvliang Ventilation and Gas Control Center of Mines, Shanxi Lvliang 033000)
出处
《山东煤炭科技》
2019年第2期94-96,99,共4页
Shandong Coal Science and Technology
关键词
高瓦斯矿井
大采高综采
综合治理
系统优化
high gassy mine
fully mechanized mining with large mining height
comprehensive management
system optimization