摘要 为了分析一次性爆破拆除多栋建筑造成的地面振动的特征及对周边建筑物的影响,对武汉交通学校群楼爆破拆除中的地面振动进行了测量,并对实测的塌落振动的峰值、频谱特性进行分析。结果表明:此次监测记录到的峰值频率在5~10 Hz,对比高架桥以及单一高层结构爆破拆除数据,倒塌叠加使得振动能量在频谱上分布更加离散,其峰值频率与周边结构自振频率相差变大,周边建筑共振的危险性降低;对于周围的结构而言,水平振动持时大于竖向振动,但水平振动幅值明显小于竖向振动;爆破塌落振动的竖向分量对周围结构的威胁较大,应采取有效的缓冲及隔振措施;由《爆破安全规程》和周边建筑爆破前后主振频率分析可知,本次爆破拆除工作未对周边建筑造成破坏性影响,验证了群楼爆破拆除方案的高效性和安全性。 In order to analyze the characteristics of ground vibration caused by demolition of several buildings by one-off blasting and its influence on surrounding buildings,the ground vibration during blasting demolition of a group of buildings in Wuhan Jiaotong School was measured,and the peak value and spectrum characteristics of the measured collapse vibration were analyzed.The results show that the peak frequency is 5~10 Hz,comparing with the demolition data of viaduct and single high-rise structure,collapse superposition makes the distribution of vibration energy more discrete in frequency spectrum,the difference between predomination frequency and natural frequency of surrounding structure becomes larger,and the danger of surrounding building resonance is reduced;For the surrounding structures,the duration of horizontal vibration is longer than that of vertical vibration,but the amplitude of horizontal vibration is obviously smaller than that of vertical vibration;The vertical component of blasting collapse vibration is a great threat to the surrounding structure,so effective measures of buffering and vibration isolation should be taken.According to the"blasting safety regulations"and the main vibration frequency analysis of surrounding buildings before and after blasting,which verifies the high efficiency and safety of the blasting demolition scheme,the blasting demolition work has not caused destructive effect on surrounding buildings.
作者 刘璇 杨永强 胡进军 谢礼立 LIU Xuan;YANG Yongqiang;HU Jinjun;XIE Lili(Key Laboratory of Earthquake Engineering and Engineering Vibration,Institute of Engineering Mechanics,CEA,Harbin 150080,China;School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China)
出处 《地震工程与工程振动》 CSCD 北大核心 2019年第1期158-165,共8页 Earthquake Engineering and Engineering Dynamics
基金 国家重点研发计划(2017YFC1500602) 国家自然科学基金项目(51308516) 中国地震局创新团队发展计划~~
关键词 群楼 爆破拆除 塌落振动 峰值 频谱 group building blasting demolition collapse vibration peak value spectral characteristics
  • 相关文献

参考文献10

二级参考文献53

  • 1陈宝心,邓敉.建(构)筑物机械拆除方法综述[J].施工技术,2004,33(6):50-51. 被引量:26
  • 2余永强,张英才,盖四海.新乡火电厂大型建构群爆破拆除[J].工程爆破,2004,10(3):41-44. 被引量:2
  • 3郑炳旭,高荫桐,肖文雄,璩世杰,龚敏.定向爆破抛掷距离研究与分析[J].爆破,2006,23(4):1-3. 被引量:11
  • 4汪旭光 周家汉 王中黔 等.我国爆破事业的发展和在新世纪的展望[A]..工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001..
  • 5亨利奇J.爆炸动力学及其应用[M].北京:科学出版社,1987..
  • 6陈仲颐,周景星,王洪瑾.土力学[M].北京:清华大学出版社,2007,4.
  • 7GUO Yue-liang, ZUO Yu-jun,WANG Di-an. Discussion on Collapse Vibration Caused by Demolition Blasting [A]. New Development on Engineering Blasting APS Blasting 1[M], 2007 Kunming China. Beijing:Metallurgical Industry Press,2007.
  • 8周家汉,陈善良,杨业敏,戴铭荣.爆破拆除建筑物时振动安全距离的确定[A]:工程爆破文集(第三辑)[C].北京:冶金工业出版社,1988,112-119.
  • 9周家汉,金保堂,陈善良.高烟囱拆除爆破及塌落振动测量与分析[A].工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001,707-712.
  • 10于亚伦.工程爆破理论与技术[M](全国工程爆破作业人员统一培训教材).北京:冶金工业出版社,2004,323-358.

共引文献312

同被引文献43

引证文献3