快易收口网在后浇带施工中的应用

Application of fast and easy formwork in the construction of post-pouring belt
下载PDF
导出
摘要 五河水利枢纽船闸工程的上下闸首底板、墙身及闸室底板上均布置有后浇带,为缩短工期,确保施工质量,QC小组开展了应用快易收口网作为后浇带模板的技术研究,提出了快易收口网安装和混凝土浇筑的质量控制措施,有效缩短了后浇带施工工期,实现了质量优良的目标,取得了较好的社会和经济效益,值得推广应用。 Upper and lower lock heads, walls and lock chamber bottom board of Wuhe water conservancy hub shiplock are provided with post-pouring belts. QC team carries out technical research on applying fast and easy formwork as post-pouring belt templates in order to shorten the project time limit and ensure the construction quality. The fast and easy formwork installation and concrete pouring quality control measures are proposed, thereby effectively shortening the construction period of post-pouring belt and achieving the goal of good quality. Good social and economic benefits are achieved, which is worth popularization and application.
作者 顾永明 蒋兴勇 周宏萍 GU Yongming;JIANG Xingyong;ZHOU Hongping(Jiangsu Water Conservancy Construction Engineering Co., Ltd., Yangzhou 225002, China)
出处 《水利建设与管理》 2019年第2期78-81,共4页 Water Conservancy Construction and Management
关键词 船闸 后浇带 快易收口网 质量控制 工期 QC小组活动 ship lock post-pouring belt quick and easy formwork quality control project time QC team activities
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部