摘要 This paper reviews the development of U.S. longwall mining from an unknown to became the world standard in the past five decades with emphasis on automation. Large scale longwall face equipment were imported from Germany and United Kingdom to increase production in the 1970 s and great effort was made to improve them to suit U.S. conditions, rather than domestic market. Automation began with the development of electrohydraulic shields in 1984 and continue to present. Introduction of first generation semi-automated longwall system occurred in 1995 and step-to-step improvement continues to present following the development of sensor technology and internet of things(IOT). Since then, emphasis on new development has been concentrated on the improvement of equipment reliability, miner's health and safety as well as production, including dust control techniques, proximity sensor, anti-collision and remote control. Automation is classified into two categories: automation of individual face equipment and automation of longwall system. The automation development of longwall system is divided into three stages: shearer-initiated-shield-advance(SISA), semi-automated longwall system, and remote control shearer. This paper reviews the development of U.S. longwall mining from an unknown to became the world standard in the past five decades with emphasis on automation. Large scale longwall face equipment were imported from Germany and United Kingdom to increase production in the 1970 s and great effort was made to improve them to suit U.S. conditions, rather than domestic market. Automation began with the development of electrohydraulic shields in 1984 and continue to present. Introduction of first generation semi-automated longwall system occurred in 1995 and step-to-step improvement continues to present following the development of sensor technology and internet of things(IOT). Since then, emphasis on new development has been concentrated on the improvement of equipment reliability, miner's health and safety as well as production, including dust control techniques, proximity sensor, anti-collision and remote control. Automation is classified into two categories: automation of individual face equipment and automation of longwall system. The automation development of longwall system is divided into three stages: shearer-initiated-shield-advance(SISA), semi-automated longwall system, and remote control shearer.
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第2期151-159,共9页 矿业科学技术学报(英文版)
基金 provided by the National Key R&D Program of China (No. 2017YFC060300204) the National Natural Science Foundation of China (Nos. 51604267 and 51704095) Yue Qi Young Scholar Project CUMTB Yue Qi Distinguished Scholar Project (No. 800015Z1138)
关键词 LONGWALL mining AUTOMATION Shield SHEARER AFC Longwall mining Automation Shield Shearer AFC