摘要 伴随着我国经济水平不断发展,我国电力部门以及企业都得到了快速发展,为我国能源提供创造了良好的条件,作为电力工程中最为主要的部分,能否将变电气高质量、高效率的安装于我国电力部门以及企业电气工程中对于我国电气工程有着重大影响,由此看来,送变电电气工程安装对于电力系统来说极为重要,此文通过研究我国电力部门送变电电力系统安装过程存在的问题,并提出了相应的解决办法,希望能为我国电力工程发展起到一定作用。 With the continuous development of China's economic level,China's electric power sector and enterprises have been developing rapidly,which has created good conditions for China's energy supply.As the most important part of electric power engineering,whether to install transformer electric power with high quality and efficiency in China's electric power sector and enterprise's electrical engineering has a significant impact on China's electrical engineering.Electrical engineering installation of power transmission and distribution is very important for power system.This paper studies the problems existing in the installation process of power transmission and distribution system in China's power sector,and puts forward corresponding solutions,hoping to play a certain role in the development of power engineering in China.
作者 杨栋 Yang Dong(Shanxi Taihang Construction Development Co.,Ltd.,Yangquan 045000,China)
出处 《电声技术》 2018年第12期23-24,28,共3页 Audio Engineering
关键词 送变电电气工程 安装 调试 Electrical engineering of power transmission and transformation install debugging
  • 相关文献

参考文献1

二级参考文献1

共引文献1

同被引文献4

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部