里底水电站碾压混凝土大坝施工工艺控制及改进

Construction Technology Control and Improvement of Roller Compacted Concrete Dam of Lidi Hydropower Station
下载PDF
导出
摘要 介绍里底水电站主要碾压混凝土施工工艺、施工方法和实施成果。里底水电站将碾压混凝土砂石粉含量上限选到24%,适当加大了砂率,使新拌碾压混凝土拌和物的工作性能更好的满足了现场施工及层间结合质量提升要求,同时控制了胶凝材料用量,达到了实用、经济双指标目标。取芯成果18.8m长芯样完整,表面光滑致密,骨料分布均匀,层间结合良好。 This paper introduces the construction technology, construction method and implementation results of the main roller compacted concrete of Lidi Hydropower Station. Lidi Hydropower Station selected the upper limit of RCC sand powder content to 24%, increased the sand rate appropriately, so that the performance of fresh RCC mixtures can better meet the requirements of site construction and interlayer bonding quality improvement, while controlling the amount of cementitious materials, achieving the practical and economic targets. The core is, the core sample is complete and 18.8 meters long, which has smooth and compact surface. The aggregate distribution is uniform, and the interlayer bonding is good.
作者 梁皓 Liang Hao(Sinohydro Bureau 14 Co.,Ltd,Weixi 674606)
出处 《云南水力发电》 2019年第1期90-94,共5页 Yunnan Water Power
关键词 里底电站 大坝 碾压混凝土 变态混凝土 Lidi hydropower station dam roller compacted concrete metamorphic concrete
  • 相关文献

参考文献10

二级参考文献18

  • 1宋拥军,肖亮达.改善碾压混凝土坝层间结合性能的主要措施[J].湖北水力发电,2008(1):37-40. 被引量:6
  • 2刘海成,韦天琴,吴智敏,宋玉普.碾压混凝土拱坝的发展与展望[J].人民长江,2004,35(12):29-31. 被引量:13
  • 3田承宇,倪迎峰.彭水水电站工程碾压混凝土工艺性试验报告[R].重庆:中电八局科研设计院彭水试验室,2005.
  • 4蔡胜华,王晓军,王迎春,等.彭水水电站碾压混凝土施工工艺及原位抗剪试验[R].武汉:长江水利委员会长江科学院,2006.
  • 5梁润 冯立生.碾压混凝土的振动压实参数[J].水力发电学报,1987,(4):57-59.
  • 6DJL204-81,SLJ2-81,水利水电工程岩石试验规程[S].
  • 7王迎春,蔡胜华,杨华全.彭水水电站混凝土配合比设计及性能试验研究总报告[R].武汉:长江科学院,2006.
  • 8蔡胜华,孙明伦,王海生,王晓军.石粉含量对碾压混凝土性能的影响[J].长江科学院院报,2007,24(5):76-78. 被引量:10
  • 9蔡胜华;陈文卓.嘉陵江亭子口水利枢纽二期工程混凝土配合比设计及性能试验研究报告[R]水利部长江科学院工程质量检测中心、嘉陵江亭子口水利水电开发有限公司,2010.
  • 10何金荣;曾正宾;谭建军.碾压混凝土筑坝材料研究[A],2004.