摘要
通过实例阐述了轨道交通与沿线建筑活动之间关系的巧妙处理,既维护了沿线建筑活动的安全性,也保障了轨道交通的安全性、可实施性,对城市轨道交通前期规划有一定参考价值。
This paper expounds the relationship between rail transit and construction activities along the route through examples, which not only maintains the safety of construction activities along the route, but also guarantees the safety and enforceability of rail transit. It has a certain reference value for the urban rail transit planning.