高速铁路聚氨酯固化道床施工工艺及费用分析 被引量:3

Construction Technology and Cost Analysis of High Speed Railway's Polyurethane Curing Ballast Bed
下载PDF
导出
摘要 现阶段,我国常用的轨道结构主要有有砟轨道和无砟轨道两种,两种传统的轨道结构形式都有各自的优劣性,聚氨酯固化道床技术作为一种新型轨道结构,融合了有砟轨道和无砟轨道的优势,应用越来越多。现行铁路定额中,关于聚氨酯固化道床的概预算定额还没有成熟的体系。通过研究高速铁路聚氨酯固化道床的施工工艺,并与传统轨道结构施工工艺对比,分析聚氨酯固化道床的概预算编制方法。 Currently,there are two types of track structure commonly used in China:the ballast track and the ballastless track.The two forms have their own pros and cons.As a new type of track structure,the technology of polyurethane curing ballast bed combines both advantages of ballast track and ballastless track,which has been widely implemented.In the current railway quota,there is no mature system of the polyurethane curing ballast bed's budgetary estimate ration.This paper aims to analyze the polyurethane curing ballast bed's budgetary estimate ration preparative method,through the way of researching high speed railway polyurethane curing ballast bed's construction technology and comparing with traditional track structure construction technology.
作者 范向东 FAN Xiangdong(China Railway Corporation,Engineering Management Center,Senior Engineer,Beijing 100038,China)
出处 《铁道经济研究》 2019年第1期8-12,共5页 Railway Economics Research
关键词 高速铁路 聚氨酯固化道床 施工工艺 费用分析 high speed railway polyurethane curing ballast bed construction technology cost analysis
  • 相关文献

参考文献2

二级参考文献26

  • 1萧定方,张旭琴.90年代国内外聚氨酯弹性体的状况与发展趋势[J].聚氨酯工业,1993,8(1):3-8. 被引量:16
  • 2赵国堂.铁路轨道刚度的确定方法[J].中国铁道科学,2005,26(1):1-6. 被引量:84
  • 3SELIG E T,WATERS J M. Track geotechnology and ture management [ R ] London : Thomas Telford, 1994.
  • 4LIM W L. Mechanics of railway ballast behavior [ D ]. Nottingham :The University of Nottingham,2004.
  • 5高速铁路轨道技术国家重点实验室,拜耳材料科技(中国)有限公司,北京铁路局,等.聚氨酯固化道床及轨道结构减振技术的试验研究[R].北京:中国铁道科学研究院,2011.
  • 6QUANTE F. Innovative Track Systems Technical Construction. Innovation for Railway Track[ M ]. Munich:Fraunhofer Institute IITB. ( 2001 - 11 ) [ 2013- 07 ]. http ://www. promain, org.
  • 7QUANTE F. Innovative Track Systems-Criteria for Their Selec- tion. Innovation for Railway Track [ M ]. Munich: Fraunhofer Institute IITB. ( 2001- 11 ) [ 2013- 07 ] http ://www. promain. org.
  • 8WOODWARD P K,KENNEDY J,MEDERO G. Improving the Safety of the Railway Track Infrastructure using Insitu Polyurethane Geocomposites [R]. Scotland: Heriot-Watt University, 2009.
  • 9ZHANG C X. A Polyurethane Railway Track Bed,a Preparing Method and the Usage Thereof.: Germany, EP 072930 [P].2012-08-04.
  • 10WOODWARD P K, THOMPSON D, BANIMAHD M. Geocomposite Technology:Reducing the Railway Maintenance Cycle [J]. Transport Journal, 2007,160 ( 3 ) : 109-115.

共引文献48

同被引文献17

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部