隧道动态开挖施工工法

Dynamic tunnel excavation construction method
下载PDF
导出
摘要 隧道施工中,机械地执行管理程序,僵化、教条地执行设计图纸,当遇到掌子面围岩地质情况较好时,开挖过程中的偷工减料和材料浪费现象比较严重;而掌子面围岩地质情况差时,极易造成坍塌或初期支护变形开裂,增加加固处理或换拱费用。采用动态开挖施工工法,保证开挖过程顺利有序,降本增效,确保质量和安全。 During the tunnel construction,the management procedures are executed mechanically,and the design drawings are implemented rigidly and dogmatically.When the geological conditions of the surrounding rock of the tunnel face are good,the phenomenon of cutting corners and wasting material during the excavation is serious.However,if the geological conditions of the surrounding rock are poor,it can easily cause collapse or deformation and cracking of the primary lining,and increase the cost of reinforcement treatment or arching.The use of dynamic excavation construction methods guarantees a smooth and orderly way of excavation process,thereby reducing costs,increasing efficiency and ensuring quality and safety.
作者 申杰 Jie Shen(China Transpon talon Infrastructure Maintenance Group Co.,Ltd,Beijing 100011,China)
出处 《青海交通科技》 2018年第4期108-112,共5页 Qinghai Transportation Science and Technology
关键词 隧道 动态 开挖 施工 tunnel dynamic excavation construction
  • 相关文献

参考文献1

二级参考文献3

  • 1孙均.地下工程设计理论与实践[M].上海科学技术出版社,1996..
  • 2中铁西南科学研究院研究报告.隧道工程施工监测与支护系统信息化设计[R].,1987..
  • 3中铁西南科学研究院研究报告.公路隧道软弱围岩支护系统可靠性应用与研究[R].,2002..

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部