摘要
本文分析了《综合布线系统工程验收规范》(GB/T 50312—2016)标准变更的主要变化内容,结合工程实际与测试原理,介绍了永久链路和光纤测试,并分析了综合布线系统未来的发展趋势。
In this paper,the main changes of Code for Engineering Acceptance of Generic Cabling System(GB/T 50312-2016)standard were analyzed,the permanent link and fiber optic test were introduced in combination with engineering practice and test principle,and the future development trend of the comprehensive wiring system was analyzed.
作者
邢军
XING Jun(Henan Electronic Information Product Quality Supervision & Inspection Institute,Zhengzhou Henan 450005)
出处
《河南科技》
2018年第35期57-58,共2页
Henan Science and Technology
关键词
综合布线
永久链路
光纤测试
integrated wiring
permanent link
fibre optic testing