期刊文献+

LNG接收站BOG产生因素及预防措施 被引量:3

Discussion on the factors and preventive measures of BOG in LNG receiving station
下载PDF
导出
摘要 通过从LNG接收站的实际情况出发,梳理了BOG的产生因素,主要包括热量入侵、储罐压力、初始充满率、LNG组分以及储罐进出料,并从以上角度入手,论述分析了多种可降低BOG产生量的预防措施,以期节约资源,降低成本,提高经济效益。 Based on the actual situation of the LNG receiving station, this paper combs the factors of BOG, including heat intrusion, tank pressure, initial filling rate, LNG composition and tank in and out, and starts from the above perspective. Various precautions were taken to reduce the amount of BOG produced,in order to save resources, reduce costs and improve economic efficiency.
作者 王金孝 王修康 Wang Jinxiao;Wang Xiukang(Xi'an Shiyou University,Xian,Shaanxi,710065,China;China Shipping Fujian Natural Gas Co.,Ltd.,Putian,Fujian,351158. China)
出处 《云南化工》 CAS 2019年第1期119-120,共2页 Yunnan Chemical Technology
关键词 LNG接收站 BOG 产生因素 预防措施 LNG receiving station BOG generating factors preventive measures
  • 相关文献

参考文献4

二级参考文献22

  • 1兰书彬,金颖,江金华.液化天然气储罐蒸发率试验和计算[J].石油化工设备,2005,34(2):34-36. 被引量:4
  • 2刘浩,金国强.LNG接收站BOG气体处理工艺[J].化工设计,2006,16(1):13-16. 被引量:128
  • 3初燕群,陈文煜,牛军锋,刘新凌.液化天然气接收站应用技术(Ⅰ)[J].天然气工业,2007,27(1):120-123. 被引量:68
  • 4刘浩,周永春.LNG低温储罐压力安全系统设计[J].化工设计,2007,17(1):7-10. 被引量:27
  • 5Hosoo Kim,Myung-Wook Shin,En Sup Yoon. Optimization of operat- ing procedure of LNG storage facilities using rigorous BOR model [ C ]. Proceedings of the 17th World Congress -The International Fed- eration of Automatic Control Seoul,Korea,2008.
  • 6Faruque Hasan M M,Alfred Minghan Zheng, Karimi I A. Minimizing boil-off losses in liquefied natural gas transportation[J]. Industrial & Engineering Chemistry Research ,2009,48:9571-9580.
  • 7Querol E, Gonzalez-Regueral B, Garcia-Torrent J, et al. Boil off gas (BOG) management in Spanish liquid natural gas (LNG) terminals [J]. Applied Energy,2010,87(11):3384-3392.
  • 8Rama Subba Reddy Gorla. Probabilistic analysis of a liquefied natural gas storage tank [ J ]. Applied Thermal Engineering, 2010,30 : 2763- 2769.
  • 9LEMMERS S p B,Fluor Haarlem B V. LNG receiving and regasifica- tion terminal operations [ J ]. Hydrocarbon Processing, 2005 ( 7 ) : 55- 61.
  • 10Myung Wook Shin, Dongil Shin, Soo Hyoung Choi, et al. Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tank[J]. Korean Journal of Chemical Engineering, 2008, 25 ( 1 ): 7-12.

共引文献83

同被引文献27

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部