摘要
在社会经济快速发展的背景下,城市化进程在逐步加快,城市人口也在不断增加,导致城市交通压力不断加大,因此,地铁工程数量也在不断增加。在地铁车站机电安装工程中,涉及多个方面的系统知识,如排水和消防系统、通风空调系统、低压配电和照明以及弱电系统等。在施工设计环节,管线综合排布是其重点与难点部分,各个不同专业之间的管线排布设计能够较好满足设计要求、设计规范、施工要求、维护要求等。
Under the background of the rapid development of the social economy,the process of urbanization is accelerating step by step,and the urban population is also increasing,which leads to the increasing pressure of urban traffic.Therefore,the number of subway projects is also increasing.In the mechanical and electrical installation project of Metro station,there are many aspects of system knowledge,such as drainage and fire protection system,ventilation and air conditioning system,low voltage distribution and lighting system,and the weak current system,etc.In the link of construction design,pipeline layout is the key and difficult part.The pipeline layout design between different specialties can better meet the design requirements,design specifications,construction requirements,maintenance requirements and so on.
作者
王宪峰
WANG Xian-feng(The 1st Engineering Co.Ltd.of China Railway Electrification Engineering Group,Beijing 100070,China)
出处
《中小企业管理与科技》
2019年第4期191-192,共2页
Management & Technology of SME
关键词
地铁工程
机电安装
管线综合排布
BIM技术
Metro project
mechanical and electrical installation
comprehensive pipeline arrangement
BIM technology