期刊文献+

宽厚板余材板坯智能匹配系统的设计与开发

Design and Development of Intelligent Matching System for Heavy Plate Residual Slab
下载PDF
导出
摘要 为了满足莱钢宽厚板生产线在订单组合及组板设计方面的要求,为设计者提供决策每一批订单最优组板方案所需的基本数据和信息,自主开发了宽厚板智能组板系统,其中余材板坯智能匹配系统实现了多功能订单余材板坯信息选择、智能板坯设计、虚拟大板订单优化匹配等功能,采用数学规划算法解决虚拟大板与订单的优化匹配难题,设计了融合经验知识和规则的智能组板模型。系统投用后,余材板坯组板成材率显著提高,至2018年7月共进行余材坯匹配组板52 829t,组板成材率88.69%,较系统投用前提高了1.45%。 In order to meet the requirements of the Laiwu steel heavy plate production line in the order combination and the design of plate, to provide the designers with the basic data and information needed to make decisions for each group of optimal plates, Shanxin software Company Laiwu automation division Ltd. has independently developed a heavy plate intelligent plate system. Among them,the intelligent matching system for residual slab is of new design and excellent performance. The function of multi function contract material information selection, intelligent slab design, and virtual large plate contract optimization matching are realized. The optimization matching problem of virtual large plate and order is solved by mathematical programming algorithm, and an intelligent plate model which combines experience knowledge and rules is designed. Since the system was put into operation in July 2017, the yield of residual slab has increased significantly. By July 2018, 52 829 tons of residual slab matching has been carried out. The yield of residual slab matching is 88.69%, which is 1.45% higher than that before the system was put into operation.
作者 谭玉倩 TAN Yuqian(Shanxin Software Company Laiwu Automation Division Ltd.,Laiwu 271104,China)
出处 《山东冶金》 CAS 2019年第1期64-66,共3页 Shandong Metallurgy
关键词 宽厚板 余材板坯 智能组板 优化匹配 heavy plate residual slab intelligent plate optimization matching
  • 相关文献

参考文献3

二级参考文献20

  • 1贾志欣.排样问题的研究现状与趋势[J].计算机辅助设计与图形学学报,2004,16(7):890-897. 被引量:44
  • 2Frlsch A M, Miguel I, Walsh T. Modeling a steel mill slab design problem//Proceedings of the 1JCAI-OI Workshop on Modelling and Solving Problems with Constraints. Seattle, 2001:39.
  • 3Hnieh B, Kiziltan Z, Miguel I, et al. Hybrid modelling for robust solving. Ann Oper Res, 2004, 130 ( 1 -.4 ) : 19.
  • 4Gargani A, Refalo P. An efficient model and strategy for the steel mill slab design problem//Proceedings of the 13th International Conference on Principles and Practice of Constraint Programming. Providence, 2007:77.
  • 5Van Hentenryck P, Michel L. The steel mill slab design problem revislted//Proceedings of the 13th International Conference on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems. Paris, 2008.377.
  • 6Dawande M, Kalagnanam J, Lee H S, et al. The slab-design problem in the steel industry. Interfaces, 2004, 34(3) :215.
  • 7Denton B, Gupta D, Jawahir K. Managing increasing product va- riety at integrated steel mills. Interfaces, 2003, 33(2) :41.
  • 8Vonderembse M A, Haessler R W. A mathematical programming approach to schedule master slab casters in the steel industry. Manage Sci, 1982, 28(12) :1450.
  • 9Dash S, Kalagnanam J, Reddy C, et al. Production design for plate products in the steel industry. IBM J Res Dev, 2007,51 (3/ 4) :345.
  • 10Sapena O, Onaindia E, Garrido A, et al. A distributed GSP approach for collaborative planning systems. Eng Appl Artif lntell, 2008, 21 (5) :698.

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部