摘要
为给实际工程排沙设施的设计和布置提供依据,基于1∶60整体模型,根据淤积泥沙扬动流速相似原理,试验研究大古水电站2条排沙廊道和1个底孔在不同运行方式下坝前库区的排沙效果和排沙漏斗形态。结果表明:排沙洞开启顺序对最终排沙效果影响不大;深水条件下,坝前排沙漏斗形态主要受泥沙特性决定,非黏性沙的排沙漏斗坡度接近于淤积泥沙水下休止角;大古水电站排沙设施的设计方案具备保证电站进水口"门前清"的条件。
Based on the similarity criteria of incipient velocity,an experimental study is performed on a 1∶60 overall physical model to study the sediment flushing effects and sand funnel patterns of two desilting galleries and one bottom tunnel under designed operating conditions to provide a basis for the design and arrangement of the desilting facilities in front of the Dagu Hydropower Station Dam.The results show that the ultimate desilting effect is less affected by the operating order of the desilting tunnels.The patterns of sand funnels are mainly determined by the sediment property,and the slope of the sand funnels is close to the underwater repose angle of non-cohesive sediments under deep reservoir water level.The design scheme for the desilting facilities in Dagu Hydropower Station guarantees the condition of clear in front of the hydropower intake.
作者
王芳芳
吴时强
高昂
薛万云
WANG Fangfang;WU Shiqiang;GAO Ang;XUE Wanyun(State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Nanjing Hydraulic ResearchInstitute,Nanjing 210029,China;College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China)
出处
《水利水电科技进展》
CSCD
北大核心
2019年第2期51-55,94,共6页
Advances in Science and Technology of Water Resources
基金
国家自然科学基金青年科学基金(51409165)
国家自然科学基金(51379128)
关键词
扬动流速
排沙廊道
底孔
排沙漏斗
水下休止角
大古水电站
incipient velocity
desilting gallery
bottom tunnel
sand funnels
underwater repose angle
DaguHydropower Station