本项目位于深圳市福田中心区段,因广深港客运专线需要下穿滨河益田立交桥以及益田路人行天桥,根据深圳福田站区域地形地貌特征情况及穿越建筑物的基本形式和穿越方式,需对桥梁进行桩基托换施工,有效地加固区域建筑物的基础与结构,消除客运专线隧道下穿过程中的安全隐患,能更加安全地满足隧道穿越桥梁的要求。
The project is located in the central section of Futian, Shenzhen. Because the Guangzhou-Shenzhen-Hong Kong passenger dedicated line needs to cross the Riverside Yitian overpass and the Yitian Road pedestrian overpass, according to the topographic and geomorphological characteristics of Futian Station in Shenzhen and the basic form and crossing mode of the building, it is necessary to underpin the pile foundation of the bridge to effectively strengthen the regional construction. The foundation and structure of the building, eliminating the hidden danger in the process of passing under the passenger dedicated line tunnel, can more safely meet the requirements of the tunnel crossing the bridge.
出处
《科技创新导报》
2018年第27期23-24,26,共3页
Science and Technology Innovation Herald
关键词
桩基托换
施工监测
钻孔注桩
Pile underpinning
Construction monitoring
Bored piles