按电网调度要求,秦山核电500kV联合开关站线路出线采用"出串"和"空充"运行方式,这种非常规运行方式将对线路保护产生一定影响。为此根据线路实际运行情况,分析原因,提出运行方式建议。
According to the requirements of power dispatching, the line out-series operation and unloaded operation are adopted in Qinshan Nuclear Power 500KV combined switch station. The unconventional operation mode has a certain impact on line operation. The causes were analyzed on the basis of the actual operation of the line in this paper. The suggestions for operation mode were put forward.
作者
李嘉敏
吴俊
LI Jiamin;WU Jun(CNNP Nuclear Power Operations management Co. ,Ltd. ,Haiyan 314300,China)
出处
《电工技术》
2019年第3期90-91,93,共3页
Electric Engineering
关键词
线路保护
"出串"运行
"空充"运行
line operation
line out-series operation
unloaded operation